Nambiar District 25 Metro & STRR Timeline for Buyers on Sarjapur Road
Nambiar District 25's connectivity outlook—Yellow Line metro already running, the Hebbal–Sarjapur (Red Line) in the pipeline, and the 288 km STRR ring road—directly affects commute time, rentals, and long-term prices on Sarjapur Road. If you are shortlisting a nambiar apartment here or comparing luxury apartments in Sarjapur Road, these dates and distances tell you when value kicks in and how strong it can be.
District 25 sits off Sarjapur Road near Dommasandra, planned as a large, multi-phase township. In buyer conversations, a "nambiar apartment" usually means a home in this community with township-scale amenities and thoughtful planning. Because of the project's scale, external links are not a side note. They are the hinge that turns a good plan into a smooth daily routine and a stronger investment.
The Yellow Line is live and provides an immediate transit anchor for the wider south and south-east corridor.
Nearest operational stations to D25: Bommasandra and Hebbagodi, roughly 12–14 km from the site.
Why it matters now: Faster access to job hubs like Electronic City and HSR Layout reduces car-only dependence. That steadies rentals and keeps buyer sentiment firm in the D25 catchment.
The Hebbal–Sarjapur corridor has cleared state approval and awaits the Union Cabinet's nod. It is planned at about 37 km with 28 stations and a proposed stop at Muthanallur Cross.
Proximity to D25: the Muthanallur Cross station is indicated at about 900 meters from the township gate.
Build window in the plan: construction expected to begin late 2025, aiming for operations by December 2030.
Why it is the big unlock: A direct train from Sarjapur to Hebbal through Bellandur, Marathahalli, and Koramangala compresses citywide trips. For anyone comparing Upcoming apartments in Sarjapur Road, this single line is the long-game catalyst for premiums within easy walking distance of stations.
Bengaluru's Satellite Town Ring Road (STRR) is a 288 km access-controlled expressway with six lanes plus service roads.
What is open: the Dobaspet–Hoskote (≈80 km) stretch has been operational since March 2024.
Completion goal: the full corridor is targeted for 2027.
Impact on D25: faster access to peripheral highways, better routing for cabs, school buses, and deliveries, and less pressure on choke points like the ORR as more segments open.
These are practical, on-foot estimates from the township gate at a typical walking speed of ~5 km/h. Internal walks from your tower to the gate can add 3–8 minutes.
Muthanallur Cross (proposed Red Line): about 900 m from the gate, 11–14 minutes on foot; add 2–3 minutes at peak for crossings.
Dommasandra (proposed Red Line): around 1.0–1.2 km from the gate, 12–16 minutes on foot; add 3–4 minutes at busy junctions.
Buying tip: stacks closer to the Chandapura–Dommasandra Road edge keep total door-to-platform time lower. Final station entrances can shift at detailed design, so treat these as informed estimates.