The Nambiar District 25 Phase 3 EOI window is now open. This next chapter of the 100-acre township on Sarjapur Road introduces new towers rising to 3B+G+32 floors, with early-bird pricing hovering around ~₹11,500 per sq. ft. For buyers who want the strongest entry point into one of East Bangalore's most established townships, this is the window to watch.
| Metric | Phase 2 | Phase 3 |
|---|---|---|
| Market Rate | ~₹10,500/sq. ft. | ~₹11,500/sq. ft. |
| Tower Height | 2B+G+28 Floors | 3B+G+32 Floors |
| RERA Status | Registered (PR/200825/008011) | Registration in Progress |
| Status | Under Construction | EOI Open |
Phase 3 towers are designed with triple basements (3B), a significant upgrade from Phase 2's double basement configuration. This means more dedicated parking, better structural load distribution, and future-ready infrastructure. Every basement level is planned with EV charging stations, reflecting the shift toward electric mobility that is already underway in Bangalore's tech corridors. The additional basement also allows for improved water management systems and utility routing, keeping the ground-level landscape cleaner and greener.
Here is something most buyers do not know: EOI allotments at Nambiar District 25 follow a chronological queue system. This means the earlier you register your Expression of Interest, the higher you sit in the allotment order. It is not random and it is not a lottery. Your position in the queue directly determines when you get to pick your preferred unit, floor, and facing. Early registrants consistently secure premium inventory that later entrants never see.
Q. Is the EOI amount refundable?
Yes, the EOI amount is fully refundable if you choose not to proceed after reviewing the final pricing and unit details. Nambiar Builders maintains a transparent refund process, typically completing refunds within 30-45 days of a written withdrawal request.
Q. What configurations will Phase 3 offer?
Phase 3 is expected to offer 2 BHK, 3 BHK, and 4 BHK configurations, continuing the range established in earlier phases. Exact carpet areas and layouts will be confirmed at launch, but early indications suggest sizes ranging from approximately 1,200 sq. ft. to 3,000 sq. ft.
Q. Why does Phase 3 have a triple basement?
The triple basement addresses three needs: expanded parking capacity for the taller towers, dedicated EV charging infrastructure across all levels, and improved structural engineering that supports the 3B+G+32 floor configuration. It also allows mechanical and utility systems to be housed below grade, freeing up more open space at the ground level.
| Enquiry |